- What is manufacturing workflow data?
- First-person video of a real, multi-step production or assembly procedure, captured against a written skill spec, decomposed into step units through task decomposition, labeled with action segments and hand pose, and delivered under a buyer-owned commercial license.
- How is this different from assembly task data?
- Assembly task data captures one named skill — fastening, measuring, press-fit — in isolation. Manufacturing workflow data captures a full multi-step procedure as one sequence, with the order and hand-offs between steps preserved in the written spec and the labeled episode.
- Does the workflow need to already exist as a formal written SOP?
- No. A documented procedure, a training video, or an operator walking through the steps are all workable starting points — the capture program writes its own skill spec from whichever source is available.
- Are mistakes and corrections captured, or only the clean version of each step?
- Where the spec calls for it, failure case coverage deliberately captures a step going wrong and the operator’s recovery as its own labeled segment, alongside the clean completion path.
- How are operators and anything else in frame protected?
- Every contributor signs a documented release as part of a consent chain, and faces, plates, and screens anywhere in frame are detected and irreversibly blurred at ingest, confirmed by human review before delivery.
- Who owns manufacturing workflow data captured this way?
- The buyer. Delivered data carries a perpetual, buyer-owned, non-exclusive commercial license by default, with exclusivity available, rather than a research-only arrangement.
- Which formats can manufacturing workflow data be delivered in?
- RLDS, LeRobot, WebDataset, HDF5, zarr, or Rerun .rrd, or raw streams with metadata — the same formats available on any custom order, built around the same episode and action-segment structure.
- How long does a first manufacturing workflow batch take?
- A median of 48 hours from signed spec to first validated batch where the bench or production-cell setting’s coverage is already deep; roughly three to four weeks where new contributors need to be recruited into an unfamiliar environment.